Paper Tower

A 30-minute team build against a clock and a book

Twenty sheets, one meter of tape, twelve minutes — the tallest tower that survives the book test wins.

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

When your project starts to lean —

does your team diagnose, or build faster?

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

The build

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

The run of show

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

What the room records

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

Three ways it fails, three rescues

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

Three questions at the book test

1. What did the silent three minutes plan — and what survived the tape?

2. Whose hands were on the tower, whose voices were at the table — same people?

3. When it started to lean: did the team diagnose, or build faster?

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

The measure

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

The tower is the transcript.

Point at it — do not describe it.

Keep every tower standing until the debrief is done.

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

The one change

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

.

Print the cards · run the build · debrief beside the wreckage

The height is the scoreboard; the lean is the lesson.

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

Take this folder with you

Scan for the digital edition — the printable kit, the live form and the agent file. Swap this href for your own QRCode-AI code or FormLM link.

WorkshopSkill · Paper Tower — Slide Deck · CC BY 4.0

NOW

NEXT

RUN CLOCK

00:00

KEYS

S drawer · B house mode · T timer
N note
60
← → turn · Space next point · F fullscreen · N speaker notes · S presenter drawer · B house mode · T round timer